Design Your Duct Layout


Contact Information
* All fields required
Name* Company Phone Fax
Address City State Zip Email*

STEP ONE: Facility Information
Enter the dimensions of the building or the area to be addressed. If the building is irregular in shape enter the total square dimension even if it falls outside the walls of the facility. Maximum size is 100 by 100. If your size is bigger than that, call us.
Size of Building (Feet) - Max length & width 100 Ft.
Length: ft
Width: ft
Height of Duct: ft 
Ceiling Height: ft 
 
 
STEP TWO: Termination Point
This is usually a collector but it can also be existing duct.
Height: ft 
Dimension:  

Drag the Symbol ‘T’ to the point of the termination. If the point is out side the building, locate it as such.

STEP THREE: Pick-Up Points
1. Enter a name for reference.
2. Enter the size of the opening of the pick-up if known.
3. Pick-up Point Height should be the distance of the pickup from the floor.
4. Indicate if you want the pickup ‘blast gated’, (also known as cut-offs) with a ‘Y’ or ‘N’. A blank assumes that it is to be open at all times.
5. Drag the number symbol to the approximate location on the grid. Do this for each machine.

Drag the numbered symbol to the approximate location on the grid. Do this for each machine.
Name Opening in inches
(dia" or dimen.)
Pick-up
Pt.Ht.
Blast Gate
Yes or No
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Theme colors

 

Skin Layout

  • Opened
  • Border
  • Boxed

Texture